Case studies

Verified on every wave.

Representative engagements. Client names and full reports available under NDA.

AI datacenter fabric

512-GPU training fabric, lossless from day one

A model lab in Texas needed a back-end fabric for 64 GPU nodes that would not stall collectives. We designed a rail-optimized 400G RoCEv2 fabric on Arista 7060X, tuned PFC/ECN and buffer profiles on the twin, and benchmarked before handover.

Scope · 64 nodes, 512 GPUs, 8 rails, 2 spines, 16 leaves

Result · NCCL all-reduce at 97% of theoretical on handover

Delivered · fabric as code, twin, live portal

Timeline · 11 weeks from design freeze to first training job

400G · Arista · 2026
Migration program

Cisco ACI to Juniper Apstra without a maintenance weekend

An enterprise datacenter with 38 leaves and 400+ EPG contracts wanted multi-vendor freedom. Contracts were mapped to Apstra blueprints and security zones, each wave rehearsed on the twin, and legacy decommissioned only after verification.

Scope · 38 leaves, 4 spines, 2 pods, 412 contracts

Result · zero rollbacks used across six waves

Delivered · blueprint as code, repository, runbooks

Timeline · one quarter, all cutovers in normal windows

38 leaves · 6 waves · 2025
Firewall migration

ASA and FortiGate estate consolidated onto Palo Alto

A regional financial institution ran three firewall platforms with 1,400 rules nobody dared remove. Policy was translated, de-duplicated and tested against captured production flows before three waves of cutover.

Scope · 14 firewalls, 1,400 rules, 3 platforms

Result · zero rule loss, 31% fewer rules, Panorama as single source

Delivered · policy as code, twin test harness, evidence for the regulator

Timeline · 9 weeks

PA-Series · 3 waves · 2025
Campus

Juniper Mist campus for a 14-site healthcare group

Legacy Cisco campuses at 14 clinics and a hospital moved to an EVPN campus fabric on Juniper EX with Mist, Wi-Fi 7 and medical-device segmentation, operated under our AIOps portal.

Scope · 14 sites, 212 switches, 640 APs

Result · ticket volume down 40% in the first quarter

Delivered · site-by-site cutover, Marvis run for the customer

Timeline · two quarters, academic-style calendar constraints respected

14 sites · Mist · 2025
SD-WAN & SASE

MPLS exit to Fortinet Secure SD-WAN with Alkira cloud exchange

A distributed manufacturer with 60 branches backhauled every cloud session through one datacenter. Branches moved to FortiGate SD-WAN in waves; AWS, Azure and SaaS entered through Alkira with inspection applied once.

Scope · 60 branches, 2 datacenters, 3 clouds

Result · MPLS cost down 58%, cloud latency down 70%

Delivered · templates as code, SLA dashboard in the portal

Timeline · 5 months, no flag-day cutover

60 sites · FortiGate · Alkira · 2025
Digital twin

Twin-gated change pipeline for a colocation provider

A multi-tenant operator with weekly fabric changes and a history of outages adopted our twin-and-repository workflow. Every change now passes a Batfish and Containerlab run before the window.

Scope · 3 fabrics, 120 switches, ~40 changes a month

Result · change-related incidents to zero over two quarters

Delivered · pipeline, twin, drift detection, training

Timeline · 6 weeks to first gated change

120 switches · twin · 2026